Y plan wiring diagram

A three-port mid-position valve shares the boiler between heating and hot water. Know which wire is live when, and the valve tests itself.

Y plan: one mid-position valve

A three-port valve shares the boiler between heating and hot water. Know which wire is live when, and the valve tests itself.

Y plan, how the lives run. Programmer heating on feeds the room stat; when it calls, the white wire drives the mid-position valve. Programmer hot water on feeds the cylinder stat; when it calls, its terminal 1 feeds the boiler and pump directly. Hot water off and cylinder stat satisfied both feed the grey wire. The valve end switch puts the orange wire live to the boiler and pump once port A is open. Blue is the motor neutral.

How it works: the lives only. Neutrals and earths left off, apart from the valve's blue. Page 19 shows the same circuit wired at a wiring centre.

Which wire does what

WhiteFrom the room stat, live when heating is called.
GreyLive when hot water is off on the timer, or the cylinder stat is satisfied.
OrangeOut from the end switch. Live once port A is open. Feeds boiler and pump.
BlueMotor neutral.
Green/yellowEarth.

What the valve does

Hot water onlyValve not powered, rests on port B. Cylinder stat terminal 1 feeds boiler and pump direct.
Heating onlyWhite and grey live. Drives to port A. Orange live.
BothWhite live, grey dead. Stops in mid position, both ports open.

Force tests: prove the valve

Isolate, make each link at the wiring centre, then power up. Put the wiring back as you found it.

  1. Live Heating only. Grey and white to permanent live. Valve drives to A, boiler and pump run, port A warms.
  2. Live Hot water only. Grey and white made safe, cylinder stat common to live, stat calling. Port B warms.
  3. Live Both. Grey made safe, white to live. Valve stops in mid position, both ports warm.

All three pass: the valve is fine. Look at the stats and the programmer.

Common faults

Valve lets by. Radiators warm on hot water only. Debris stops port A sealing.

Seized ball or paddle. No heating or no hot water.

End switch. White live, valve open, orange dead.

Synchron motor. White lifted, ohms white to N: typically 2,000 to 2,500 Ω, or the manufacturer’s figure for that motor. OL or far out is faulty.

Ghost voltage on white. A stray voltage with nothing calling can fire the boiler. Find the faulty control first. A trade tip, not a rule: some engineers fit a suppressor from orange to N as a last resort.

Y plan at the wiring centre

On a real job nothing is wired control to control. Every cable runs back to a wiring centre and lands on a numbered terminal.

Example: terminal numbers vary by wiring centre, follow the label in the box.

Y plan wired through a 10-way wiring centre. Terminal 1 live, 2 neutral, 3 earth from the 3 amp fused spur. Programmer heating on to 4, which feeds room stat 1; room stat 3 to 5, which feeds the valve white. Programmer hot water on to 6, which feeds cylinder stat common. Programmer hot water off, cylinder stat 2 and the valve grey on 7. Cylinder stat 1, valve orange, boiler switched live and pump live on 8. Neutrals on 2, earths on 3.

Every cable to the wiring centre. The same circuit as page 18, wired the way you'll find it. Neutrals share terminal 2 and earths share terminal 3.

What lands where

1 LFused spur live, programmer L, boiler permanent live.
2 NSpur, programmer, room stat 2 (if it has one), valve blue, pump, boiler.
3 ESpur, valve green/yellow, pump, boiler.
4Programmer CH ON (4) to room stat 1.
5Room stat 3 to the valve white.
6Programmer HW ON (3) to cylinder stat C.
7Programmer HW OFF (1), cylinder stat 2, valve grey.
8Cylinder stat 1, valve orange, boiler switched live, pump live.

On the job

Read the box first. Wiring centres don't all number the same way. Use the label inside the lid, or trace each cable back to its control.

Room stat 2 goes to neutral, if the stat has one. Terminal 2 on the stat, terminal 2 at the wiring centre. Two-wire and battery stats have no neutral: they only switch the live, so connect just the stat’s two terminals and follow its instructions.

The force tests on page 18 are done here. Isolated, lift the white and grey off 5 and 7 and land them on 1, then power up. Put every core back where it came from.

Boiler wiring varies. Some boilers want a permanent live as well as the switched live, and some drive the pump themselves. Follow the boiler’s manual for its own terminals.

Free guide

Get Fault Finding Basics as a PDF

This lesson is part of Fault Finding Basics, our free 26-page guide: safe isolation, your meter, how a combi works and the five tests that find most faults. Add your email and it comes straight over.

Send me the guide

Want every test? The Flint Field Guide has all 56 chapters with a video for every test. £97 once, updates included.